Originally posted by talltigeguy
View Post
I had originally thought about using a single drain pump for the bow sac and having it mounted in the bilge in front of the gas tank. I am rethinking this due to the lack of working space as the only access to this area it through the bilge vent hose holes in the storage consoles. I would also have to put a hole in each bulkhead for the drain hose. This would require more 2 additional barbed pass-thrus and other plumbing. For only $31 and faaaarrrrrrr less work, I can just add a 2nd drain pump and thru-hull.
I still plan on installing an extra bilge pump in front of the gas tank anyway and that would further complicate the install of the drain pump.
Most likely if I get motivated I am going to shorten the thru hull to the manifold line to move the manifold back. I am going to put the check valves closer the to bags and make sure the pump outlets are straight up. We shall see. Definately going to add another bilge pump and move my drain pumps into the battery compartments.
Comment