Originally posted by shane
View Post
I did! Had my first issue after 101 hours this weekend. Had a lead wire going to a rocker switch that had no power. It was horrible, it took me 7 minutes to fix. Was probably to do some previous wiring I did on my LED or shower install.
Now, as far as what Studman feels is enough time to make a decision, is up to him as my feelings will be different.
Tell me about it, the IRS's fav saying is "I see we have it, it's in review"
For 3 F'ing yrs.
Comment