Originally posted by WABoating
View Post
T-hull/ball-valve/pump = 11" from the t-hull outer flange.

T-hull/elbow/ball-valve/pump = 5H x 11L

T-hull/valve/elbow/pump = 8H x 9L

In regards to using 1" plumbing and stepping down to 3/4 IFT's, a simple 1" male x 3/4 female bushing is all thats needed. I do not feel that a 3/4 thru hill will starve a single 3/4" inlet pump. Especially when its below the waterline.
For a manifold, it's a good idea to fab a support or hanger to relieve the load on the elbow and PVC pipe that connects the manifold to the elbow.
That sounds fine until the sack in your lockers are filled and you have to stop the flow of water getting into the boat. Getting to that area is going to be a PITA.